AI infrastructure where power already exists

Deploy AI compute without waiting for new power.

Neurengy qualifies existing industrial and commercial sites, deploys modular compute at available electrical capacity, and connects it to AI demand through one managed platform.

Demand-led deployment 50 kW → multi-MW site classes Managed distributed control plane
POWER → COMPUTE → DEMANDReference architecture
Existing siteAvailable power500 kW
NeurengySite ClusterGPU / AI
Customer demandManaged workloads24/7
EDGE / SMALL SITE50–250 kW
SITE CLUSTER250 kW–1 MW
AI HUB1 MW+
17%Data-center electricity growth in 2025

IEA reports that global data-center electricity consumption rose 17% in 2025.

Source · IEA, 2026 ↗
~950 TWhProjected global data-center demand by 2030

IEA's updated central projection rises from 485 TWh in 2025 to about 950 TWh in 2030.

Source · IEA, 2026 ↗
3×AI-focused electricity use, 2025→2030

IEA's 2026 update projects electricity consumption from AI-focused data centers to triple over this period.

Source · IEA, 2026 ↗

External statistics are linked to their original sources. Scenario outputs elsewhere on this site are Neurengy model assumptions unless explicitly sourced.

The product

One platform. Three parts of the infrastructure.

Neurengy handles the physical complexity underneath a simple commercial interface.

01

Site infrastructure

Power, cooling, space, connectivity, access and operating constraints are qualified before deployment.

02

Compute infrastructure

Standardized modular clusters are matched to the site and target workload rather than forcing one hardware profile everywhere.

03

Control platform

Telemetry, orchestration, workload placement, availability, billing and commercial access are coordinated centrally.

PHYSICAL RESOURCEExisting site + available power
→
NEURENGY INFRASTRUCTURECompute cluster + telemetry + control
→
DIGITAL SERVICEAI inference, batch, agents, private AI
Reference class · 50–250 kW Reference class · 250 kW–1 MW Reference class · 1 MW+
Speed to power

Use power that is already connected — instead of waiting for a new connection.

The core advantage of distributed infrastructure is time. Neurengy starts from qualified existing capacity, so the critical path shifts from grid expansion to site engineering, equipment and commissioning.

NEURENGY PATH Target: weeks to first deployment
01 Site screen days
02 Engineering 1–3 weeks
03 Equipment & install several weeks
04 Commission & earn after validation
VS
NEW POWER / GREENFIELD Often measured in years
01 Grid application queue & studies
02 Permits & design months
03 Grid construction months / years
04 Capacity available only after connection
Why it matters: every month saved before commissioning is a month in which the asset can start serving AI demand and generating revenue. The timeline above is a target operating model, not a guaranteed deployment schedule; actual timing depends on site readiness, equipment lead times, permits and local requirements.
Two-sided infrastructure platform

Power on one side. AI demand on the other.

FOR SITE PARTNERS

Monetize capacity you already have.

You provide the site and available power. Neurengy structures the infrastructure, operations and demand channel.

  • New recurring revenue stream
  • Better utilization of existing assets
  • Flexible capital structure
Qualify a site
FOR COMPUTE BUYERS

Get capacity closer to users and data.

Suitable workloads can be placed across qualified regional sites through one coordinated platform.

  • Locality-aware workload placement
  • Reserved or contracted capacity
  • One interface over distributed infrastructure
Request compute
Project economics

Calculate the economics of a site before deployment.

Available power is only valuable when the full project economics work. Use the detailed calculator to model revenue, electricity, CAPEX, site income, Neurengy fees, investor cash flow, payback and break-even.

PROJECT ECONOMICS CALCULATOR

Model your site in detail

Model whole-server deployment, installed CAPEX, electricity, site income, Neurengy fees, investor cash flow, payback, break-even and price/utilization sensitivity.

Open economics calculator ↗ Opens as a separate full-screen page.
Locality-aware orchestration

The platform chooses the closest suitable infrastructure — not simply any available GPU.

A request is evaluated against location, network path, hardware, current load and data requirements. Neurengy then routes the workload to the best qualified site.

AI
REQUEST ORIGIN

AI customer / enterprise

Model request + data + SLA requirements

→ Neurengy evaluates
SELECTED

Regional Site A

Network8 ms
HardwareSuitable
Load42%
AVAILABLE

Regional Site B

Network31 ms
HardwareSuitable
Load67%
NOT SELECTED

Remote Site C

Network74 ms
HardwareSuitable
Load25%
→ workload runs nearby
✓
RESULT

Closer compute

  • Lower network distance
  • Less unnecessary backbone traffic
  • Regional data-processing options
The example values above illustrate the routing logic; they are not benchmark results. Actual placement depends on measured network and infrastructure conditions.
Neurengy Research

The Power–Compute Gap

A 46-page review of the global data-center and AI-infrastructure market.

GLOBAL DATA CENTER & AI INFRASTRUCTURE REPORT 2026

The Power–Compute Gap

How grids, connected power, modular infrastructure and distributed orchestration may reshape the next phase of AI capacity growth.

Market dynamicsInfrastructure bottlenecksSolutionsESG
46pages
77sources

Отчёт подготовлен на английском языке.

Download report · PDF ↓ Published August 2026 · Neurengy Research
For investors

Build AI capacity from power that already exists.

Neurengy is building an energy-first distributed AI infrastructure business. The investment thesis is simple: instead of waiting for every new megawatt to be built from scratch, qualify existing power, deploy modular compute against real demand, and aggregate sites through one operating platform.

INVESTMENT THESIS
SCARCE RESOURCEConnected power
→
NEURENGYDeploy + operate
→
MONETIZATIONAI workloads

The objective is a repeatable infrastructure model in which each qualified site becomes another deployable unit of the same network.

01

A structural bottleneck

AI infrastructure needs more power, while new grid capacity and greenfield data-center development can take years. Existing connected capacity creates an alternative path to deployment.

02

Capital can scale deployment, not just R&D

Funding can be directed into qualified compute capacity, site engineering and the control platform — assets and capabilities that move the company toward revenue-producing infrastructure.

03

Flexible infrastructure financing

Compute equipment does not have to sit permanently on the startup balance sheet. Infrastructure can be financed by Neurengy, site partners or third-party capital, allowing the operating platform to scale with different ownership structures.

04

A broader platform opportunity

Distributed compute is the first commercial application. The same infrastructure can later support AI-managed flexible loads, industrial optimization, adaptive automation and Programmable Energy services.

What the next capital should prove

Move from architecture to repeatability.

1Deploy and operate the first managed compute sites
2Validate site economics against real utilization and tariffs
3Prove repeatable demand and workload quality
4Standardize deployment, monitoring and operating procedures
Current stage: reference architecture, economics modeling and pilot preparation. The purpose of the next phase is to prove repeatability before large-scale infrastructure expansion. Nothing on this page constitutes an offer of securities, a return guarantee or investment advice.
Enterprise impact

Use additional power to create more value from the whole system.

Compute adds electrical load. The business case is that monetization and AI-enabled optimization can create larger economic and operational benefits — and, where measured, potentially lower the carbon intensity of the core business.

YOUR ENTERPRISE

Available power + rising energy costs

Energy bills ↑
$
Additional income

Compute monetization can offset part of energy costs.

AI
Higher efficiency

AI can optimize equipment, processes and resource use.

CO₂↓
Lower carbon intensity / ESG

Only when verified savings exceed the footprint of added compute.

Pilot path

Qualify first. Deploy second. Scale after proof.

01

Site screen

Power, tariff, space, cooling, connectivity and constraints.

02

Engineering model

Electrical topology, thermal design, hardware class and operating procedures.

03

Demand + capital

Select workload channel and financing structure before scaling CAPEX.

04

Validate & scale

Measure uptime, economics, workload quality and site operations.

Founding team

Energy infrastructure experience meets commercial execution.

CEO & CTO

Pavel Cheremisin

~20 years in energy systems, industrial automation and technology products. Leads product architecture, engineering and company strategy.

inLinkedIn profile
CCO

Igor Dubinnikov

Leads commercial strategy, partnerships and fundraising, with a focus on turning infrastructure opportunities into repeatable business development.

Long-term vision · Reasonable Energy

Energy should be intelligent, efficient — and responsibly used.

Reasonable Energy is broader than applying AI to energy. It is the idea that power, equipment and data already available to people and organizations should be used more consciously — creating economic value while improving efficiency, accessibility and environmental outcomes.

Platform foundation. Neurengy aims to create a common infrastructure foundation for flexible compute, intelligent load control, industrial optimization, adaptive automation and future programmable-energy services.
NOW

Distributed AI infrastructure

Qualify existing sites, deploy compute and aggregate it through one coordinated platform.

NEXT

AI-managed flexible loads

Coordinate digital and electrical loads using power availability, operating priorities, tariffs, carbon intensity, network conditions and service requirements.

LONG TERM

Programmable Energy

Turn electrical loads and automation into software-defined, AI-managed functions that can adapt to operating priorities, energy conditions and business goals.

Start with a site or a workload

Find out whether Neurengy fits your infrastructure.

For site owners: send location, available power, tariff, space and connectivity. For AI customers: send workload type, region, hardware requirements and expected utilization.